Deals and links 1
-
ENERCON supplies Holtec International Licensing services: ENERCON supported preparation of Holtec's construction permit application (Part 1: LWA and comprehensive ER) for Palisades Pioneer Units 1 & 2; NRC accepted it Feb 2026. Completed deliverable.
“ENERCON is proud to have supported Holtec in preparation of the Construction Permit Application LWA and Comprehensive ER.”
Plants and sites 1
-
Holtec International owns Palisades Pioneer Units 1 & 2 Power plant · Planned · Covert, MI · Planned; construction permit application Part 1 accepted by NRC (Feb 2026). 'owns' inferred from Holtec being the applicant - verify.
Sources 5
- 1 https://www.holtecinternational.com/contact/ holtecinternational.com
- 2 https://holtecinternational.com/company/ holtecinternational.com
- 3 https://www.enercon.com/nrc-accepts-holtec/ enercon.com
- 4 https://world-nuclear-news.org/articles/second-part-of-construction-permit-application-submitted-for-pioneer-smrs world-nuclear-news.org · published 2026-10-02
- 5 https://www.ans.org/news/2026-01-14/article-7673/holtec-submits-partial-construction-permit-application-for-smrs-at-palisades/ ans.org · published 2026-01-14